We are a professional high temperature nickel alloy pipe stainless steel welded pipe manufacture.Zhejiang Bewell Steel Industry Co., Ltd, with superior geographical location and convenient transportation, is a leading manufacturer of stainless steel welded pipes in China, and currently has advanced stainless steel cold rolling, cold drawing and heat treatment technology in China, with an annual production capacity of 4,000 tons, and a modern production-oriented enterprise with stainless steel seamless steel pipes as the leading products of manufacturing, production and sales.
Bewell® Nickel-based casting high-temperature alloys withγ-phase as the matrix, add aluminum, titanium, niobium, tantalum, etc. to formγ' phase (see intermetallic compound phase of high-temperature alloy materials) for strengthening, the number ofγ' phase is high, some alloys up to 60%; adding cobalt can increase the dissolution temperature of theγ' phase, thereby increasing the alloy's Use temperature, is your best choice.
Product name |
High Temperature Nickel Alloy Pipe Stainless Steel Welded Pipe |
Outer diameter |
10mm-200mm |
Thickness |
0.4mm-6mm |
Steel Grade |
310S, 410, 316, 347, 304, 304L |
Surface Finish |
2B/2D/BA/2BA/No.1/No.4 |
Standard |
ASTM/GB/AiSi/JIS |
Welding Line Type |
Welded |
Tolerance |
±1% |
MOQ |
1 Ton |
Processing Service |
Bending, Welding, Decoiling, Punching, Cutting, Moulding |
Section Shape |
Round |
Invoicing |
by actual weight |
Delivery Time |
8-14 days |
Certification |
ISO9001:2015 |
Application |
Construction,petroleum, chemical industry, mechanical equipment |
Package |
Standard Seaworthy Package |
Payment terms |
30%TT Advance + 70% Balance |
Sample |
Provide |
localised corrosion resistance
(2)high tensile and fatigue strength
(3)Fully stocked
(4)No rusting
Q1: What are the advantages of your company?
A(1): Prime quality and reasonable price.
(2): Wide excellent experiences with after-sale service.
(3): Every process will be checked by responsible QC which insures every product's quality.
(4): Professional packing teams which keep every packing safely.
Q2: What is the MOQ?
A: 1 tons.
Q3: What’s the delivery time for the tubes normally in your company?
A: 45-60 days for 1-4 containers base on the how many items.
Q4: What payment terms you can deal with?
A: Mostly we deal with TT terms and L/C,for L/C we need to know which bank to open the L/C and after checking the bank information to decide whether to accpet the L/C.If you have other preference, please negotiate.
Q5: Could you print our company logo or information on the tubes plastic bag and the outside package also?
A: Is there extra cost for it?A: We can follow customer’s request to print your own information plastic bag for quantity at least 1 container(22-26 tons), and we won’t charge the extra cost.